Craig Gibson, PhD., CPG., a Qualified Person as defined by NI-43-01 regulations and President, CEO and a director of the Company, has reviewed and approved the technical disclosures in this news release. Repair of access roads and trenching will be undertaken in April, and drilling is anticipated to begin in June.ĭr. To view an enhanced version of this graphic, please visit:ĭetailed exploration mapping and sampling is ongoing to refine drill targets at each of the main mineralized areas previously identified. Geologic map of the Los Pavitos project showing permitted trenches and drill sites. Craig Gibson, President and CEO of the Company, "We are looking forward to be able to construct trenches across mineralized structures in our ongoing program for target generation, and to subsequently drill test the mineralized structures."įigure 1. ![]() "We are very pleased to receive the environmental permit that will allow the first ever drill program to be conducted at Los Pavitos," said Dr. ![]() The permit contemplates construction of as many as 23 trenches and 30 drill sites. (CSE: PRIZ) (OTCQB: PMOMF) (" Prismo" or the " Company") is pleased to announce that it has received its drill permit for its 5289 hectare (20 square miles) Los Pavitos project located in the well mineralized Alamos region of southern Sonora State, Mexico. Vancouver, British Columbia-(Newsfile Corp. ![]() Prismo Metals Receives Drill Permit for Los Pavitos Company Overview Our Team Our Commitment Success Stories Upcoming Events Careers.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |